willis company assigns overhead cost to jobs on the basis of 125% of direct labor cost. the job cost sheet for job 313 includes $10,000 in direct materials cost and $12,000 in direct labor cost. a total of 1,000 units were produced in job 313. what is the unit product cost for job 313?