RTE exam SAFe 5. some doubt about questions final exam.
06-What are two benefits of having a team definition of done? (Choose two.)
To measure the team's capacity to load ratio
To maintain predictability
To reduce technical debt
To optimize quality
To collect team performance Metrics
10-An Agile Release Train (ART) is frequently discovering compatibility issues between the developed Solution and the Enterprise information architecture.
What can the Release Train Engineer do to prevent this from occurring?
Conduct entire data architecture design upfront
Add data Architects onto ART
Develop more detailed Feature definitions
Confirm attendance of architectural representatives at Program Increment (PI) Planning
17-How does the Release Train Engineer help develop the Agile Release Train (ART) over time?
Analyze velocity trend
Propose an ART improvement Roadmap
Facilitate post-PI Planning
Conduct a retrospective
25-A Scrum Master reports that the team feels like it is doing fine and would rather focus on work than waste time coming up with and implementing improvement ideas. The team has recently had trouble meeting their Iteration commitments, so the Scrum Master knows the team can do better. The Scrum Master asks the Release Train Engineer (RTE) for help. What might the RTE suggest as a first step?
Arrange for an external coach for team to help them to improve
Observe the team's daily stand-ups and have a meet-after about the importance of relentless improvement
Review team Metrics with Scrum Master and look for specific improvement areas that can be shared with the team <- Cela pourrait aussi être ça
Dedicate additional meeting time to brainstorm improvement items
26-What is a Release Train Engineer anti-pattern behavior during the scrum of scrums or PO sync meetings?
Ignoring emotion focusing on content <- Celle-là peut être aussi bonne, mais pas certain.
Expressing positive feelings and praise
Resolving impediments
Ensuring compliance items are addressed
34-Which statement is true about the definition of done (DoD)?
The DOD should evolve as system capabilities evolve
The teams share one common DOD
At the higher levels there is only one DOD for everything that passes through Agile Release Train to a Solution increment or a release
DOD is not used by teams because it is used as a method to manage technical debt across the ART
35-During the Agile Release Train (ART) kickoff session, Operations raises a concern that they are already spread very thin and have no time to collaborate with all the teams on the ART, What should the Release Train Engineer recommend to discover bottlenecks and provide governance for Operations' engagement?
Visualize the deployment pipeline requests through a Kanban system
Have Operations staff sit within the team areas
Abstract platform/infrastructure requests from build/deploy requests
Ensure all Devops practitioners attend Leading SAFe training
36-Which two key skills does a Release Train Engineer bring to economic prioritization? (Choose two,)
Determine job size by surveying Scrum Masters of impacted teams
Coordinate Lean Portfolio Management by providing feedback for cost of delay factors
Facilitate stakeholder collaboration
Understand and facilitate weighted shorted job first
Do research and data collection for cost of delay factors
60-Which two behaviors are an important part of the Release Train Engineer role? (Choose two.)
Drive teams to specific outcomes
Provide answers about Features
Coach leaders to increase alignment
Encourage teams to self-organize
Manage dependencies for team