on july 1 2022 blue spruce inc invested 788900 in a mine estimated to have 805000 tons of ore of uniform grade. during the last 6 months of 2022 131,000 tons of ore were mined. Required:
1) Calculate depletion cost per unit.
2) Prepare the journal to record depletion.