Answer :
Answer:
put a down a point at (5,4) and go down 1 right 2, then plot another point.
You also can go from (5,4) up 1, left 2 and plot a point.
Answer:
put a down a point at (5,4) and go down 1 right 2, then plot another point.
You also can go from (5,4) up 1, left 2 and plot a point.