ANSWER ASAP! ALL SCAM LINKS WILL BE REPORTED.

Answer:
The answer is (C) y = 55 + 15 x
Step-by-step explanation:
This is because the cost of the plan must be added to the cost of the lines to find the total cost. The equation for option (C) correctly depicts that y the plan, needs to be added to x the lines. This equation correctly shows the relationship between the two numbers.