The total cost is given by:
[tex]c(m)=0.2m+2[/tex]a.
m = 1
[tex]\begin{gathered} m=1 \\ c(1)=0.2(1)+2 \\ c(1)=0.2+2 \\ c(1)=2.2 \end{gathered}[/tex]b.
m = 2.7
[tex]\begin{gathered} m=2.7 \\ c(2.7)=0.2(2.7)+2 \\ c(2.7)=0.54+2 \\ c(2.7)=2.54 \end{gathered}[/tex]Answer:
$2.20, $2.54